Floor heating floor laying method

The floor heating system requires a more complex environment, and requires high thermal conductivity and dimensional stability of the floor. In order to ensure better heat conduction and avoid deformation of the floor, laminate flooring with a thickness of not more than 8mm should be selected. Ordinary solid wood flooring, bamboo flooring, laminate flooring and laminate flooring with a thickness of more than 8mm should not be used in places with floor heating systems.
Pre-laying requirements a Before the construction, the floor heating system must be tested for warm water supply. The water temperature should be at least 50 °C, the floor heating system should be running normally, and it should be kept for more than 12 hours. Confirm that there is no leakage before construction. It is not possible to carry out the above tests.
b Construction methods that damage the surface are not allowed to avoid damage to the heat sink coil.
c During cold construction in winter, the floor should be stored in the site for more than 12 hours in advance to adapt to temperature changes and reduce floor deformation.
d Before installation, check whether the ground is flat, dry, clean, whether the window door is complete, whether there is leakage in the relevant facilities, and whether the clearance between the door and the ground is sufficient.
e Lay the special floor mat on the floor and seal it at the interface with a dry tape.
f The direction of the floor laying, the long side of the floor should be consistent with the direction of the light in the room. When installing, the first row of the floor should be grooved to the wall, and the wooden wedge should be placed between the floor and the wall to ensure the floor expansion gap 8-12mm. The floor between the rows should be installed in a staggered manner and the distance between the seams should be greater than 20 cm.
g When laying, the height difference, gap and other defects of the board surface should be observed at any time. After passing the test, the glue can be spliced ​​and the residual glue on the board surface can be removed immediately.
h Do not walk on the floor within 12 hours after installation. Other follow-up operations should be carried out after 24 hours.
i The floor laying length is more than 8m, or the interface between the room, hall and hall, the floor must be cut off, leaving 8-12mm expansion joints, and connected by the closing bar to reduce the occurrence of floor arching.
The installation of the skirting board should cover the expansion joint when installing the skirting board.
Precautions a When disposing the room, the heat dissipation of the floor should be considered. It is not advisable to place the legless furniture to avoid local deformation of the floor due to poor heat dissipation.
b When it is used for the first time or when it is not used for a long time, it should be slowly heated (recommended heating rate is 1 °C/h) to prevent the floor cracking and distortion caused by too fast heating rate; at the same time, keep the floor dry.
c When the indoor air is relatively dry, the indoor humidity should be adjusted appropriately.

Clothes Dryer:

Clothes Dryer, also known as drying racks, as people daily use of household items, has now become a lot of family necessities of life. It is not only an ornament, but also a functional product. At present, the "function" of the Clothes Drying Rack has been widely recognized by consumers and has formed an "industry". After years of grinding, the quality of the industry has gradually stabilized.  It is made of rust-proof coating steel and sturdy plastic joints, is durable and lightweight. It is easy to use and can be open and closed quickly. The two side wings can be lifted independently and can be adjusted in different heights and positions. It can be easily folded away for compact storage.

Do not hesitate to add it to your cart! 

 

Clothes Airer&Clothes Dryer

Clothes Dryer,Clothes Horse,Clothes Drying Rack,Indoor Clothes Airer

Xinhui Mingcheng Hardware Mamufacture Limited of Jiangmen City , https://www.gd-jmmc.com